After a complete analysis, an efficient Full Vehicle model of Chassis, Installation, Layout and Production drawings with FEA Reports was delivered
Difficulty in validating the frame occurred when an Actual Load Data acting on a chassis was not available
Customers did not prefer major changes on the frame
Challenges in routing finalization with the existing frame